(250) 785 3772
Caliber Oilfield & Production Services Inc.
Trucks
2007 HYDRO VAC
COMBO UNIT
1.2 million BTU boiler
Steams up to 175 degrees Celsius through 1" steam hose
8" center pivot boom with 20 foot reach
Adjustable Vac pressure
Vac tank is sour sealed
4m3 cube water compartment
12m3 cube debris tank
4000 psi stainless cat pump
2" roper pump
170 feet of pressure wash hose
View Services
-->
TANDEM HEATING
UNIT 34
2002 Mack Truck c/w 18 speed Mack transmission
8 million BTU heater
High temp, low flow heater shutdown
3X2 mission fluid circulating pump
3” bowie suction pump
5500L diesel fuel compartment in tank for heater
1000L compartment for methanol
80ft of 3” high temp suction hose
80ft of 2” high temp discharge hose
TANDEM HOT OIL
UNIT 35
2002 Kenworth T800 c/w 18 speed Eaton transmission
5 milion BTU heater
High temp Murphy switch, c/w reset tattletale
Td Gardner Denver 3X5 Triplex pump (max rate 550ltr/min)
Maximum pumping pressure 5000psi, test 6000psi
75m 1 ¼ high pressure line pipe
40m 1” high pressure hose
3X2 mission charge pump
3” roper suction pump
4 compartment full 4:07 crude spec tank
80ft 3” high temp suction hose
80ft 2” high temp discharge hose
TRI DRIVE HOT OIL
UNIT 36
2006 Kenworth T800 18 speed Eaton transmission
5 million BTU heater
High temp, low flow heater shutdown
Teed Gardner Denver 4X5 triplex pump (max rate 980ltr/min)
Maximum pumping pressure 5000psi, test 6000psi
75m 1 ¼ high pressure piping
40m 1” high pressure hose
Truck is setup with two independent pump systems
100bbl 4:12 acid spec tank
3X2 mission charge pump
3” pipeline fill, up to a rate of 1.3m 3/min
3” roper suction pump
80ft 3” high temp suction hose
80ft 2” high temp discharge hose
TRI DRIVE HOT OIL
UNIT 37
2008 Kenworth C-500 Allison 7 speed auto transmission
5 million BTU heater
High temp, low flow heater shutdown
3 ½ X 6 SPM 600s triplex (max rate 1.2m3/min)
Maximum pumping pressure 10,420psi
75m of 1 ½ 1502 integral high pressure piping, good max rating 15,000psi
c/w Microsoft Access, data acquisition, logging and charting parameters
c/w a chemical blending line to the tank
Automatic pressure kick out on the transmission, high temp, low flow heater kick out
3X2 mission, magnum charge pump
3” pipeline fill at up to 1.5m3/min
3” roper suction pump
4:12 full acid spec 100bbl tank
80ft 3” high temp suction hose
80ft 2” high temp discharge hose
TRI DRIVE HOT OIL
UNIT 38
2007 Kenworth T800 c/w 18 speed Eaton transmission
5 million BTU heater
Auto high temp, low flow heater shutdown
Teed Gardner Denver 4X5 triplex pump (max rate 980ltr/min)
Maximum pumping pressure 5000psi, test 6000psi
75m 1 ¼ high pressure piping
Truck is setup with two independent pump systems, for acid and one other
c/w chemical blending line to tank
100bbl 4:12 full acid spec tank
3X2 mission charge pump
3” pipeline fill, up to a rate of 1.3m3/min
3” roper suction pump
80ft 3” high temp suction hose
80ft 2” high temp discharge hose
6 MAN EMERGENCY SHOWER
UNIT
32’ tri axle stiff pull c/w 28’ thermo king van body
2035gal portable water tank for shower/eyewash
Heated with a closed circulating glycol system powered by a webaso pro heat
Van heated with diesel fired air heater
6 shower heads c/w 6 eyewash stations, and 6 drench hoses
Showers supplied with water by two 1X3/5 mission pumps 50gpm each
100’ 1 ½ fire hose
2000 gal acid spec catch bladder, for contaminated water
Unit powered with a 6kw Honda generator, backed up with 12vold batteries
BRUISER WELL SITE TRAILER
Pull behind sleeper unit
c/w full bathroom, 30 gal fresh water tank
Four bunk beds
Two 100lbs propane bottles
100ft 50 amp cord c/w 30amp, 20amp, or • 110 plug-ins
Fridge, stove, fold out couch
Office